Sheet C1 · Preconstruction schedulingFor contractors
Preconstruction scheduling

Submit a bid schedule that holds up in review.

Owners compare bids on price, on the finish date and on how believable that date is. Here is what their reviewers look for, and a scorecard to check your schedule before it goes out.

Sheet C2 · The short answerWhat preconstruction scheduling is
What is preconstruction scheduling?

Preconstruction scheduling is building the project schedule before work starts: the activities, how long each takes, the order they depend on, and the finish date that results. It is the schedule you submit with the bid, and the one that becomes the baseline once the job is yours.

By Chimi Kadiya, founder of 1iQ · construction program and project manager for more than 15 years · updated November 2026

Sheet C3 · What reviewers look forSix things, in order

Six things an owner's reviewer will look for.

None of these second guess your durations. They test whether the finish date is the result of the plan.

01

Every activity is tied in

Each activity needs work before it and work after it. Open ends are the first thing a reviewer counts. Close them before you submit.

02

The critical path reaches the finish

The longest chain of dependent work should run unbroken to completion, and it should read like the way you would really build the job. Be ready to walk through it.

03

No dates are forced by hand

Hard constraints make the schedule look on time whatever the logic says, and reviewers know it. Keep only the dates the contract fixes.

04

The finish matches the logic

If the schedule is recalculated and the finish moves, the date on your bid is not the date your plan supports. Recalculate before you send it.

05

Procurement and inspections are in

Long lead items and inspections show you have planned for what really drives the dates. Give them their own activities.

06

Float is believable

Very high float reads as missing links. Negative float says the plan already misses its date. Fix the links instead of hiding the float.

Sheet C4 · Schedule scorecardP6, Microsoft Project or Excel

Check your schedule before it goes out.

Upload your schedule. 1iQ recalculates it and runs the same quality checks an owner's reviewer would. Fix what it finds, then submit.

01
A score out of 100. Based on the DCMA 14 point quality checks and on logic problems that would let a slip hide.
02
The checks passed and failed. So you know how far the schedule is from clean.
03
The three biggest problems, by name. The full list, the activities involved and a corrected copy are part of the full review.
Schedule scorecardFree · about a minute

The file is read to work out the score and is not kept. Your email is how we follow up.

Sheet C5 · Why it mattersAt bid and after award

What a clean schedule does for you.

At bid

A date the owner can believe

When the logic holds, the finish date is the result of a plan. That is easier to defend in an interview than a date with nothing under it.

In review

Fewer questions

Schedules with open ends and forced dates come back with questions. A clean one moves through review and keeps your bid in front.

After award

A baseline that protects you

When the schedule both sides agreed is on record, a delay caused by a late decision or a change shows with its date and its cause.

Sheet C6 · After the schedule is agreedPlanned against what really happens

After award, the plan stays yours.

When a project runs on 1iQ, your schedule comes in as the baseline. Your durations are your call. 1iQ checks the links and the order of work so the schedule can be tracked honestly, and it does not rewrite your plan.

From then on, progress is recorded against the baseline you agreed. Work you have earned stays earned, and nothing moves a planned date without a project manager approving it.

Because every change carries a time and a name, questions about who caused a delay are settled from the record instead of from memory.

Sheet C7 · QuestionsShort answers

Questions people ask.

What is preconstruction scheduling?

Preconstruction scheduling is building the project schedule before work starts: the activities, how long each takes, the order they depend on, and the finish date that results. It is the schedule a contractor submits with a bid and the one that becomes the baseline once the job is awarded.

How does a strong schedule help win a bid?

Owners compare bids on price, on finish date and on how believable that date is. A schedule where every activity is linked and the critical path holds together shows the date is the result of a plan. It also draws fewer questions in review, which keeps your bid moving.

What do owners look for in a bid schedule?

A complete chain of logic from start to finish, a critical path that makes sense, no dates forced by hand, time for procurement and inspections, and a finish that matches the logic. Many use the DCMA 14 point assessment as the checklist.

Will 1iQ change my durations or my plan?

No. The plan is yours. 1iQ checks the links and the order of work so the schedule can be tracked honestly. Durations, float and lags are your call and are not held against the schedule.

How does an agreed baseline protect the contractor later?

When the schedule both sides agreed is recorded as the baseline, later changes are measured against it. A delay caused by a late decision or a change shows up with its date and its cause, so the conversation is about facts instead of memory.

Which schedule files can I upload?

Primavera P6 files (.xer and .xml), Microsoft Project XML files, and Excel or CSV sheets, up to 10 MB.

Is my schedule kept after it is scored?

No. The file is read to work out the score and is not saved. Your work email is kept so the 1iQ team can follow up.

30 minutes

See how your schedule is tracked after award.

Bring a schedule to a private briefing. We will run the full review with you and show what the owner sees once work starts.

Book a briefing